An ontology of Inspection and Test Plans (ITPs) for the building, construction and related industries. This initial version is based on ITPs developed by ABE Services http://www.abeservices.com.au/ for use in the Compliance Data Management Service (CDMS). The skos:altLabel properties are the original labels used in CDMS. 0.1 Plumbing - Sewer Sewer 4-34 Plumbing - Sewer Inspection Test Plan typically used by a landscape or civil contractor for hard and soft landscaping. Landscaping 02 - Landscaping Mulching 2-08 Mulching Mulching Mechanical Services Mechanical Services External Services - Sewer 4-02 External Services - Sewer Sewer 4-39 Joinery Joinery Joinery 4-08 Footings Footings Footings Turfing 2-04 Turfing Turfing Electric BBQs 2-11 Electric BBQs Electric BBQs Asphaltic Concrete Surfacing 3-10 Asphaltic Concrete Surfacing Asphaltic Concrete Surfacing Reflective Pavement Marker Installation 3-17 Reflective Pavement Marker Installation Reflective Pavement Marker Installation 4-28 Data Cabling Data Cabling Data Cabling Stormwater Lines Stormwater Lines 3-02 Stormwater Lines Topsoiling Topsoiling 2-02 Topsoiling 3-06 Subsoil Drains Subsoil Drains Subsoil Drains 4-22 Dry Wall Partioning Dry Wall Partioning Dry Wall Partioning Inspection Test Plan used in roadworks. Roadworks 03 - Roadworks 4-09 Concrete Floor Slabs Concrete Floor Slabs Concrete Floor Slabs Inspection Test Plan ITP An InspectionTestPlan Up To 2-02 Topsoiling - see SKOS Core prefLabel, add altLabel 2-09 Fencing Fencing Fencing Water Mains. This Test Plan includes correction of some references, eg WSS 056 to WSS 012 and inclusion of Hold Point for testing. Water Mains 3-04- A-Water Mains Pipe Installation Pipe Installation 4-31 Mechanical Services - Pipe Installation Building Demolition Building Demolition 4-01 Building Demolition Conduits Conduits 3-05 Conduits 4-27 Electrical Submains Electrical Submains Electrical Submains External Services - Stormwater 4-03 External Services - Stormwater Stormwater 2-15 Mortared Stone Walls Mortared Stone Walls Mortared Stone Walls Grassing 2-03 Grassing Grassing Precast Concrete Barriers Precast Concrete Barriers 3-13 Precast Concrete Barriers 4-12 Suspended Concrete Slabs Suspended Concrete Slabs Suspended Concrete Slabs 4-06 Structural Excavations Structural Excavations Structural Excavations Thrust Boring for Water Mains Thrust Boring 3-04-1 Thrust Boring for Water Mains Inspection Test Plan common to landscaping, civil and building works. 01 - Common ITPs Common External Services - Water and Fire 4-04 External Services - Water and Fire Water and Fire 2-07-01 Planter Boxes Planter Boxes Planter Boxes Mortared Stone Pitching 2-14 Mortared Stone Pitching Mortared Stone Pitching 4-16 Metal Roof Cladding Metal Roof Cladding Metal Roof Cladding 4-40 Painting Painting Painting An Inspection Test Plan for defining Environmental Controls 1-03 Environmental Controls Environmental Controls 4-17 Roof Tiling Roof Tiling Roof Tiling Plumbing - Sanitary Fittings 4-35 Plumbing - Sanitary Fittings Sanitary Fittings 2-18 Consolidation Consolidation Consolidation Hand Placed Concrete Pavement Hand Placed Concrete Pavement 3-11 Hand Placed Concrete Pavement Minor Earthworks 1-05 Minor Earthworks Minor Earthworks 2-10 Log Barriers Log Barriers Log Barriers 4-26 Electrical Cabling Electrical Cabling Electrical Cabling 4-14 Precast Wall Panel Erection Precast Wall Panel Erection Precast Wall Panel Erection 3-16 Thermo-Plastic Line Marking Thermo-Plastic Line Marking Thermo-Plastic Line Marking 2-17 Miscellaneous Landscaping Items Miscellaneous Landscaping Items Miscellaneous Landscaping Items 4-20 Windows Windows Windows 3-15 Paint Line Marking Paint Line Marking Paint Line Marking Gas Gas 4-05 External Services - Gas Flexible Guardrailing 3-12 Flexible Guardrailing Flexible Guardrailing 4-25 Wall and Floor Tiles Wall and Floor Tiles Wall and Floor Tiles Kerb and Gutter 3-07 Kerb and Gutter Kerb and Gutter 4-19 Blockwork Blockwork Blockwork 4-11 Concrete Walls Concrete Walls Concrete Walls Brickwork 4-18 Brickwork Brickwork Inspection Test Plan used in the Building Industry 04 - Building Building 4-23 Plasterboard Walling Plasterboard Walling Plasterboard Walling 3-18 Traffic Sign Installation Traffic Sign Installation Traffic Sign Installation 4-07 Bored Piers (Small) Bored Piers (Small) Bored Piers (Small) Planting Bed Preparation 2-06 Planting Bed Preparation Planting Bed Preparation 4-21 Doors Doors Doors Concrete Paving 2-12 Concrete Paving Concrete Paving 3-19 Street Lighting Street Lighting Street Lighting Plumbing - Hot & Cold Water Supply 4-36 Plumbing - Hot & Cold Water Supply Hot & Cold Water Supply Stormwater Pits and Manholes Stormwater Pits and Manholes 3-03 Stormwater Pits and Manholes 1-04 Temporary Traffic Management Temporary Traffic Management Temporary Traffic Management Duct Installation Duct Installation 4-30 Mechanical Services - Duct Installation The Preliminaries ITP is used to 1-01 Preliminaries Preliminaries Plumbing Plumbing Bitumen Straw Mulching Bitumen Straw Mulching 2-05 Bitumen Straw Mulching Pavement Prime/Primer Seal/Bitumen Sealing 3-09 Pavement Prime/Primer Seal/Bitumen Sealing Pavement Prime/Primer Seal/Bitumen Sealing Duct Manufacture Duct Manufacture 4-29 Mechanical Services - Duct Manufacture Plumbing - Gas Services Gas Services 4-37 Plumbing - Gas Services 3-20 Gross Pollutant Trap Gross Pollutant Trap Gross Pollutant Trap Equipment Installation Equipment Installation 4-32 Mechanical Services - Equipment Installation Plumbing - Fire Services Fire Services 4-38 Plumbing - Fire Services Concrete Columns Concrete Columns 4-10 Concrete Columns 4-24 Ceilings Ceilings Ceilings 2-07 Planting Planting Planting Preparation for TCD Installation 3-14 Preparation for TCD Installation Preparation for TCD Installation Plumbing - Stormwater 4-33 Plumbing - Stormwater Stormwater 1-02 Services Clearances The Services Clearances ITP is used to 1-02 Services Clearances External Services External Services 4-15 Timber Framing Timber Framing Timber Framing 4-13 Structural Steel Erection Structural Steel Erection Structural Steel Erection 2-16 Rock Filled Mattresses Rock Filled Mattresses Rock Filled Mattresses 3-01 Sewer Mains Sewer Mains Sewer Mains Segmental Paving 2-13 Segmental Paving Segmental Paving Irrigation 2-01 Irrigation Irrigation 3-08 Pavement Construction (Excluding Surfacing) Pavement Construction (Excluding Surfacing) Pavement Construction (Excluding Surfacing)